APTPlatform Transition Intelligence

Product

Capability parity and target-platform readiness backlog.

high

Publish the measurement-gap inventory

List every unknown usage surface and start logging or manual confirmation before wave planning.

33 supporting records
  • INT-2026-03-0040integration · 2026-03-02

    Traffic exists but cannot be attributed to a known integration surface.

  • ACCTREC-2026-03-0016account · 2026-03-03

    Low recent activity cannot be interpreted because usage tracking is missing.

  • CAP-2026-03-0009capability · 2026-03-03

    Capability is enabled by default but usage tracking is absent.

high

Separate parity work from account communication

Resolve target-platform capability gaps before accounts are invited into dual access.

47 supporting records
  • READY-2026-03-0004readiness · 2026-03-01

    Capability parity blocks transition progression.

  • READY-2026-03-0013readiness · 2026-03-01

    Capability parity blocks transition progression.

  • ACCTREC-2026-03-0031account · 2026-03-03

    Target processing path exists but required capability parity is incomplete.

medium

Define billing ownership by transition state

Use one billing owner per account state so dual-active periods do not create double billing or missed billing.

26 supporting records
  • BILL-2026-03-0003billing · 2026-03-01

    A third party pays account fees and must be preserved through cutover.

  • BILL-2026-03-0004billing · 2026-03-02

    A third party pays account fees and must be preserved through cutover.

  • BILL-2026-03-0023billing · 2026-03-02

    Both platforms may be active, but one billing owner has not been assigned.

high

Create an integration rework lane

Give integrators a separate wave with test credentials, mapping guides, and verification gates.

50 supporting records
  • INT-2026-03-0011integration · 2026-03-01

    Custom code still points to source-platform interfaces.

  • ACCTREC-2026-03-0004account · 2026-03-02

    Account can use both platforms, but embedded integration work remains.

  • ACCTREC-2026-03-0053account · 2026-03-03

    Account can use both platforms, but embedded integration work remains.

high

Capability parity gaps determine sequencing

Target-platform parity gaps appear before accounts can advance to later transition states.

47 supporting records
  • READY-2026-03-0004readiness · 2026-03-01

    Capability parity blocks transition progression.

  • READY-2026-03-0013readiness · 2026-03-01

    Capability parity blocks transition progression.

  • ACCTREC-2026-03-0031account · 2026-03-03

    Target processing path exists but required capability parity is incomplete.